NYC Accelerator logo white small

Mineral scaling has been proven to increase energy consumption, decrease equipment longevity and waste water in building support equipment

“NYC climate commitment is to reduce greenhouse gas emissions by 80% by 2050”

NYC Accelerator remove mineral scale save energe climate
 
NYC Accelerator badge small


NYC Building Classifications


Class U Buildings - Utility Bureau Properties




 

redevelopment

Please excuse our messy website!
We are developing a custom content management function to effectively communicate simple to high involvement products and solutions. Our new software should be ready to implement by April 30, 2024. Go exploring… 
Contact us at 412-848-5058 or info@waslix.com with any questions.


Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


U0 – Utility Company Land And Building
U0 – Utility Company Land And Building

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Main Hot Water Pipe: S10
2" Equipment Pipes: S10

Installation Considerations:
Similar to an office building environment interested in removing mineral scale from building support equipment to decrease their energy demands.
• Energy Efficiency Studies
• Office Buildings
U1 – Bridge, Tunnel, Highway
U1 – Bridge, Tunnel, Highway

Mineral Descaling Models:
None

Installation Considerations:
Not applicable
 
U2 – Gas or Electric Utility
U2 – Gas or Electric Utility

Mineral Descaling Models:
2" Main Water Pipe: V5000
(
Administrative offices)

Installation Considerations:
Mineral descaler inclusion would be limited to support water supply in an administrative building.
• Energy Efficiency Studies
• Office Buildings



U4 – Telephone Utility
U4 – Telephone Utility

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Main Hot Water Pipe: S100
4" Cooling Operations: S50

Installation Considerations:
Similar to an office building environment interested in removing mineral scale from building support equipment to decrease their energy demands.
• Energy Efficiency Studies
• Office Buildings
U5 – Communication Facility Other Than Telephone
U5 – Communication Facility
Other Than Telephone

Mineral Descaling Models:
4" Main Water Pipe: S50
2" Cooling Operations: S10

Installation Considerations:
Similar to an office building environment interested in removing mineral scale from building support equipment to decrease their energy demands.
• Energy Efficiency Studies
• Office Buildings
U6 – Railroad – Private Ownership
U6 – Railroad
Private Ownership

Mineral Descaling Models:
None

Installation Considerations:
Not applicable
 



U7 – Transportation – Public Ownership
U7 – Transportation
Public Ownership

Mineral Descaling Models:
None

Installation Considerations:
Not applicable
 
U8 – Revocable Consent
U8 – Revocable Consent

Mineral Descaling Models:
Depended on building size and use

Installation Considerations:
Contact us so we can learn more about your building and develop a custom installation plan.
• Energy Efficiency Studies
• Office Buildings
U9 – Miscellaneous Utility Property
U9 – Miscellaneous Utility Property

Mineral Descaling Models:
Depended on building size and use

Installation Considerations:
Contact us so we can learn more about your building and develop a custom installation plan.
• Energy Efficiency Studies
• Office Buildings





Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com