Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


F1 - Factory Heavy Manufacturing - Fireproof
F1 - Factory Heavy Manufacturing (Fireproof)

Mineral Descaling Models:
2" Main Water Pipe: S10
(Administrative Offices)
6" Main Water Pipe: S250
(Factory- high water demand)

Installation Considerations:
The primary use for mineral descalers on this building type would be to support specific manufacturing and building support equipment.
• Factory/ Industrial
• Return On Investment
>F2 - Factory Special Construction
F2 - Factory Special Construction (Fireproof)

Mineral Descaling Models:
2" Main Water Pipe: S10
(Administrative Offices)
6" Main Water Pipe: S250
(Factory- high water demand)

Installation Considerations:
The primary use for mineral descalers on this building type would be to support specific manufacturing and building support equipment.
• Factory/ Industrial
• Return On Investment
F4 - Factory Industrial
F4 - Factory Industrial
(Semi-Fireproof)

Mineral Descaling Models:
2" Main Water Pipe: S10
(Administrative Offices)
6" Main Water Pipe: S250
(Factory- high water demand)

Installation Considerations:
The primary use for mineral descalers on this building type would be to support specific manufacturing and building support equipment.
• Factory/ Industrial
• Return On Investment



F5 - Factory Light Manufacturing
F5 - Factory
Light Manufacturing

Mineral Descaling Models:
4" Main Water Pipe: S50

Installation Considerations:
The primary use for mineral descalers on this building type would be to support specific manufacturing and building support equipment.
• Factory/ Industrial
• Return On Investment
F8 - Factory: Tank Farms
F8 - Factory
Tank Farms

Mineral Descaling Models:
2" Main Water Pipe: S10
(Administrative Offices)

Installation Considerations:
Used to descale administrative office water lines including hot water tanks.
• Factory/ Industrial
• Return On Investment
F9 - Factory Industrial - Miscellaneous
F9 - Factory
Industrial - Miscellaneous

Mineral Descaling Models:
¾" Main Water Pipe: V3000
(Administrative Offices)
2" Main Water Pipe: S10
(Factory- based on water demand)

Installation Considerations:
The primary use for mineral descalers on this building type would be to support specific manufacturing and building support equipment.
• Factory/ Industrial
• Return On Investment




Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.